With the hull on the laying on the ground it's much easier working. This picture is prior to laminating. I made three rebated areas for glass overlap with the electric planer: two on the side of the deck and one about 50 cm in front of the beam-bulkhead.
Deck is now laminated with UD in place and plastic on top. With the help of my brother it took about 2,5 hours with preparation.
Abonneren op:
Reacties posten (Atom)
Geen opmerkingen:
Een reactie posten