Repositioning and leveling the strongback....
Tube filled with water to check the level along the whole length of the strongback.
Frames and battens in place.
First planks in the mold. My broter Hans again lend a (big) hand. We tried a 40 cm wide foam-strip on this half, but that turned out to be too wide to be handled with ease. After that we used 20 to 25 cm wide strips, like we did on the first half.
Geen opmerkingen:
Een reactie posten