maandag 5 november 2007

We 2 are almost 1

Trial fit of the two hull-halves. A plunge bob is used to put the halves straight on top of each other. I used the beam-bulkheads at gunwale level as a reference point, as they are by far the most accurately placed parts in the hull halfs.
Impression of joined hull (rotated, of course). Looks quite roomy for a relatively small boat.

Geen opmerkingen: